监理员工自我评价
监理员工自我评价
在平时的学习、工作或生活中,我们都需要频繁使用自我评价,自我评价的功能首先表现为自我功能,它对人的自我发展、自我完善、自我实现有着特殊的意义。如何写自我评价呢?以下是小编精心整理的监理员工自我评价,仅供参考,希望能够帮助到大家。
监理员工自我评价1
Work experience and lack of supervision through this year's work, I feel as a supervisor only to do good behavior, strict self-discipline, into the team, respect for others, work seriously responsible for winning the respect of others. I met a lot of new things at the site. With Du's careful guidance and help, I learned a lot of new theories and practical experiences, which not only enrich the knowledge I could not learn in the field of specialization and atlas, but also broaden My knowledge of the industry. This year I learned a lot of professional and technical knowledge and interpersonal skills to coordinate the work of the community to continue to work hard to learn, put their minds, from the beginning of social work to change the passive state to adapt to social initiative State, in order to relax the mood, full of energy to continue into the work of tension. In future work I will be more efforts to learn the knowledge and practice of the professional capacity, and constantly sum up the lessons, and strive to do better.
The professional quality of our supervisors is uneven and the level is far from meeting the market demand. Most of the supervisors come from pure technology or construction enterprises. The knowledge structure is single, and the organization and coordination capacity is not enough. So I think I, as a young supervisor must pay attention to learning, to the site does not say outsiders, and can effectively solve the problems in the project for the construction unit advice and suggestions. Elite backbone to keep making progress, play a leading role, the new young people to study hard, pay attention to practice, do a little bit, focus on the accumulation of experience, should catch up as soon as possible.
As the real estate industry is not a special boom, the supervision industry, the employment situation as if I have a higher demand, first, the business level should be high, single-minded on the project. The second is to improve relations and coordination. I think that supervision is a service behavior, through their own professional work by the construction unit recognition, to obtain compensation to the site, we must straighten out the position, not to experts, to the law enforcement of the tone, told the construction unit in accordance with the specification procedures And laws and regulations should be how to do, but to be good at explaining the situation, so that the construction unit to understand the benefits of doing so. On the construction unit and not to managers themselves, should be clearly identified problems, said clearly to strengthen inspection and acceptance. In the process of the new district hospital, I do have a lot of things can not be resolved, then I will let the construction side, the project director to coordinate, to avoid my own to try to be tough.
监理员工自我评价2
总之,一年多的工作给我的体会是作为一名监理工程师不仅要具备丰富的专业知识,而且还要有较强的沟通协调能力,只有不断提高自己的专业技术水平和业务能力、提高自己的沟通能力和环境的适应能力,才能更好的服务于工程的建设,才能使自己得以更好的发展。在工作中各种不同的压力对我来说也是一种难得的挑战和考验,尽管一年来的工作中有很多的困难和曲折,但回首过去,也使我懂得了很多、认识了很多,同时也总结了不少的经验和教训,为以后更好的工作奠定了坚实的基础。
20xx年已经到来,在这新的一年里我将不断地完善自身的不足,总结经验和教训,不断加强自身专业技术水平和业务素质的提高,不断的充实自己。我坚信在公司领导和各位同事的大力帮助下一定能更好完成我的各项工作任务,为公司做出自己应有的贡献。
通过单位召开的民主生活会,我仔细剖析了自己的思想动态和所作所为,认真进行自我剖析,现对自身的问题进一步的反思,进行批评与自我批评。
一、个人在工作、学习以及思想作风、工作作风方面存在的问题和不足。
1、理论学习的自觉性不强,运用理论去指导实际工作不够。
2、管理方面老好人思想严重。
3、在政府工程的管理中缺乏与领导的沟通。
二、产生问题的'原因分析。
1、在钻研知识、提高能力上有惰性,还缺乏“挤”和“钻”的耐劳精神,缺乏刻苦学习的恒心,,把钻研业务当作成了一种负担。
2、没有从整个项目和单位的整体利益出发,不愿对项目部人员进行批评,怕影响同事关系、怕得罪人、顾虑太多。
3、认为自己管理工程和项目部已经很累,从心理上不愿意去想如何和部分甲方领导打交道,按部就班,按照常规的沟通出牌。
4、认为单位每周都进行学习培训,现场监理应该掌握培训的知识,没有意识到现场监理的学习精神有高有低,不是所有的人员都在认真学习。
三、今后努力方向。
我决心通过这次批评与自我批评,找准问题,抓住问题的根源,认清今后努力的方向,要在今后的工作、生活中努力克服自己存在的不足,审视自己、规范自己、严格要求自己。
1、要树立刻苦学习的精神,特别是加大对暖通、给排水、电器、消防等安装方面专业知识的学习,并且把理论要与实际紧密的结合起来,着眼于工作中的运用,通过实际的运用,上升到理论的高度要把自己的思维和步履统一到总体部署上,坚定不移的立足本岗位,为单位和项目的发展做出应有的贡献。
2、20xx年开始加强项目部管理,切实的从考勤,日记、月报、小结等方面加大管理力度,制定项目部管理制度,客服老好人思想,同时加大对那些只出勤不干活的现场监理的管理力度,使项目部的管理再上一个台阶!
3、改变懒惰的沟通思想方法,在今后的工作中要勤动脑、细琢磨,经常换位思考,加强沟通,多从侧面了解甲方的想法,提前将会出现的问题向领导汇报。
4、加强对工地的巡视力度,在巡视的过程中加强对现场监理的提问,了解其不懂之处,针对现场监理出现的不同问题,分别指导,提高现场监理的专业水平。对于本次生活会中,领导和同事们提出的意见和建议,我怀着感激的心情予以接受,大家所提到的意见也是自我批评中发现的问题。在以后的工作和生活中,通过努力学习、加强实践,深入施工现场,从工作中发现自己的不足,多开展小范围的批评与自我批评活动,做好表率、树立威信,踏实工作。
监理员工自我评价3
As a graduating student this year, I am honored to join this company, and today my probationary period has been over 3 months, and in the past three months, I initially worried about graduating as a new member of societyStudents can not get along well with people, how to do their own work, but in this company, where the leadership, where my colleagues gave me great help in the company harmonious working atmosphere, solidarity in the corporate culture , So I am very easy to change from a student into a qualified social professional. Thank you, colleagues and leadership here.
Since joining the company in September of this year, my practical work experience is basically zero, only the theoretical knowledge of the school professor, when I first came into contact with the supervision work, I was not surprised, because the actual work and There is a big difference between the textbooks. I have been very confused, but some of my colleagues under the guidance of patience, I quickly adapted to the site of the work environment, but also understand the work of a project supervisor responsibilities.
In the work of the site supervision, I am strict with myself, do not let any details of the project, so that everything must personally check the principle of access to the company colleagues and leaders of the recognition, but also access to the construction unit recognition, Professional knowledge and practical aspects of the work, the problems encountered, humbly ask colleagues to continue to enrich themselves, to contribute to the company.
In the supervision of the work, as a new graduate into the community, there are a lot of small difference, these experiences make me continue to grow, in dealing with various problems at the same time, so that their knowledge of the surface continue to expand, Consider the issue more comprehensive, to avoid the same problem in the future. I would like to thank my colleagues who have contributed to the mistakes and reminders and guidance of my work.
After three months of work, I now have to be able to independently deal with some of the engineering problems, the normative work drawings are also very familiar with, you can draw their own drawings and analysis judgment on the engineering procedure. Of course, I have a lot of problems, in dealing with the relationship between the construction unit needs to be further improved, the group cooperation is relatively poor, need to work in the future to further improve their ability.
After three months of work, I am in this company to work pride and pride, more hope to become a member of the company, to achieve their goals in life, reflect their value in life. I will be humble attitude and full of enthusiasm to do my own work for the company to create value, with the company to show a better future!
监理员工自我评价4
To this end, now the fourth quarter engineering work summarized as follows:
First, the schedule of progress
In the early stage of construction, under the consistent efforts of the whole company, the whole works well and the project has a good trend from safety, quality and progress. However, the processing of raw materials is an important link. , The audit of its materials related to the acceptance of the project safety, progress and other major links. (Materials often problems:
1, the material does not match the original drawings. Refer to the drawings one by one inspection to ensure that the material is correct; followed by raw materials in the production process to increase its efforts to monitor the company to ensure the correct production of materials for the Do not need to do a good job guarantee .
2, raw materials approach the corresponding information is not perfect is recommended in the process of distribution of materials, the organization of the corresponding information staff to prepare the appropriate information on the vehicle distribution .
3, good drawings review, the original design of common sense I would like to set up the company before the corresponding set of leadership, design, materials, engineering (recommended construction team in the conditions permitting, in the event of the construction site, The meeting will be responsible for the corresponding person in charge of a "pre-Conference" for the drawings, contracts, raw materials collection, material distribution co-ordination, design technology, on-site management issues to do a full range of analysis, co-ordination, Responsibilities, unity team strength.
In the foundation construction, the weather and other irresistible factors, is affecting the overall project successfully completed the biggest stumbling block, for this site managers should be based on the actual situation of the site, Party, weather and other factors to do the appropriate adjustments, reasonable arrangements for the construction schedule, Effective measures to catch up with the progress of the system. In this, I also deeply aware of their own shortcomings, the face of rainy weather can not reasonably organize workers to do the preparatory work for the latter part of the progress of the work, the corresponding conditions permitting the corresponding time delay caused by the progress of the project to step up , The corresponding surprise overtime is my own lack of management experience, can not be reasonable and effective deployment of workers to fully implement, so in the future work there are many places need to learn to grow.
Second, the construction safety
Site construction to be able to truly realize that production safety is a business and personal casting too fine in the premise and protection. We can realize the social attitude of "people-oriented, safety first", and can realize the importance and necessity of safety facilities, safety education and prevention. In the early stage of construction, do a good job of worker safety education, the signing of the corresponding labor contract, the security at the end, always bear in mind safety awareness, reserved warehouse project midway construction workers in the process of fall, as the scene responsible for people I can not Shirking responsibility, in the company's leadership under the same concerted efforts to take appropriate emergency measures for the injured in a timely and effective fight for the most valuable time to rescue, making the final health recovery workers to provide a strong guarantee for this I also reflect on their own deep, In the future construction site safety management work, always do a good job "Sambo, four, five edge", the construction of civilization, the safety education of workers, investigation of security risks as the focus of the work and the development of specific security Implementation of programs and measures for the smooth conduct of escort the project.
Third, the construction quality
A hundred years, quality-oriented. project, with the already completed, but still left a lot of thorny issues, such as: roof tile sun lap at the water leakage, wall windows leaks ... ... to the party's production has caused some impact, but also for the company The unnecessary loss, which I am deeply guilty, has been working to repair. In view of the above, I think in the construction process of the construction process to monitor their time, to avoid the workers paralysis thinking, to work with the team signed a technical agreement, if necessary, the quality of the agreement signed and develop the appropriate quality inspection cycle, found in the construction process quality defects The implementation of the implementation of the settlement, and truly quality problems in the dynamic management of quality inspection within. In strict accordance with national norms, standards and household acceptance criteria for the construction, the quality of the implementation.
监理员工自我评价5
一先对项目进行认真分析,结合项目实际情况如监理范围,监理内容、项目的复杂程度,项目的技术含量、规模及报建人员备案名单,并与公司管理层积极沟通,对项目配备适合机构高效运转的监理人员,包括监理工程师及数量、监理员及数量组成高效的团队,该项工作具体由总监理理工程师负责。
其次,项目团队对项目进一步的细化分析,依据委托监理合同对监理工作的要求,再进一步的明确监理的范围,内容,对合同所要达到的监理目标进行深化、细致的分析,对各个目标进行分解,同时对目标实现的可能性进行论证,找出影响目标实现关键环节,在后序监理规划及细则中制定出详细的应对措施;根据分解后的目标,对机构各成员任务的侧重点进行分工;根据监理工作的要求,向公司申请配备适合项目运转的设施、设备。
最后根据机构对项目的分析、项目的特点、难点制定针对性的规划和细则来指导监理工作,规划中内容要全面,要涉及建设工程概况、监理工程范围、监理工作内容、监理工作目标、监理工作依据、项目监理结构的组织形式、项目监理机构人员配备计划、项目监理机构的人员岗位职责、监理工作程序、投资控制工作方法及措施、进度控制工作方法及措施、质量目标控制的方法及措施、安全管理工作方法及措施、合同管理的方法与措施、信息及技术资料管理的方法与措施、组织协调的方法与措施、监理工作制度、监理设施、监理人员行为准则、质量控制点旁站要求、工程重点、难点分析及对策并附监理工作流程图和项目的合同结构图;监理细则应包括监理工作流程、监理工作控制目标及控制关键环节、要点、监理工作方法及措施。
一年的时间很快过去了,在这一年多时间里,我在公司领导、部门领导和同事们的`关心与帮助下,工作能力与专业技术有了更进一步的提高。在这年终岁末之时,总结自己工作中的成绩和收获,从而找出不足,以利于今后能够更好的完成工资任务,也衷心希望大家对总结不妥之处给予指正,对我来说是极大的帮助。
在过去的一年多时间里,我在xx项目一组团担任土建监理工程师职务,该项目涉及到土建、电气设备、园林工艺、市政管网等多种专业,是比较大的综合性项目,作为土建监理工程师的我,感到任重而道远,特别是高层建筑施工,工程量大而且施工难度和质量要求都比较高,针对该特点,在项目监理部总监及总代的带领下,制定了具有针对性的、切实可行的监理方案。从基础到主体,每道施工工序严格按照监理规范、图纸设计和国家现行施工质量验收规范实施监理工作,以抓好对建筑材料的质量控制和对施工工艺的质量控制为重点工作,确保建筑物结构安全,对工程所需的原材料审查其材料质保单、复检报告、见证取样、送检,审查其试验结果,确保原材料质量。在高层主体施工中严格检查钢筋的绑扎质量和钢筋的保护层厚度以及砼的浇筑振捣,对各施工过程中的巡视、检查所发现的问题及时采用口头形式或书面形式通知施工单位项目部,做到发现问题及时向总监汇报,并督促施工单位落实整改及进行再次的复核检查,并要求监理人员做好关键部位的旁站监理,尽自己最大的努力做好监理控制质量的事前与事中控制,尽职尽职的做好我应该做的工作,坚持了严格按图、按规范、合同实施监理,确保各分项、分部工程的合格验收。
在主体结构施工现场的监理工作中,我深感自己对主体结构工程的不足之处,对此我查阅了大量的技术规范和施工验收规范,通过自身的学习和实践掌握了与主体结构相关的技术和经验,从主体结构的模板搭设到钢筋安装和砼浇筑,严格检查每道工序施工质量,钢管构件、钢筋型号、钢筋锚固、搭接长度,钢筋原材及半成混凝土等进场后,均认真审核相关资料是否齐全,核对质保资料与材料批号是否一致,同时对有关材料进行见证取样送检,全部符合设计及规范要求。特别是钢筋及混凝土的质量,要求施工方按规范要求进行了见证取样、送检,保证了主体结构的工程质量。